H/HYDRA TOOLKIT
AI FACTORY OPERATING TOOLKIT · CONCEPT DEMO

From first signal to first GPU powered on.

Three connected tools for an NVIDIA Cloud Partner's supply side: find AI-ready power and sites, qualify and deliver them, then close the deal with every stakeholder aligned.

Start the walkthrough
01 FIND

Hydra Radar

Where is AI-ready capacity emerging?

Scores power and site leads from public news signals; CRM sync preview; market context like moratoriums and interconnection pauses.

15 leads ranked · 16.96 GW surfaced

Key screens

  • Top 5 opportunities
  • Lead inventory and filters
  • Market context
Open tool
02 QUALIFY & DELIVER

Site Accelerator

Which sites can actually deliver?

Weighted site qualification scorecard, go/no-go calls, and a pipeline tracker from First Look to First GPU Powered On.

438 MW · 10 sites

Key screens

  • Weighted scorecard
  • Pipeline tracker
  • Executive view
Open tool
03 CLOSE & ALIGN

Deal Navigator

What must every party do next?

Shared deal room across four gates (Commercial, Capital, Site/colo, Acceptance) with role-based portals, documents and a decision log.

576 GPUs · 1 of 4 gates passed

Key screens

  • Shared deal board
  • Role-based portals
  • Command Center
Open tool
HAND-OFFSRadar lead → Scorecard First LookEnergized site + capacity → Deal Navigator Gate C (Site/colo)
WALKTHROUGH

Suggested 5-minute demo path

  1. Radar Top 5
  2. Site Accelerator Scorecard (change a weight, watch the go/no-go change)
  3. Pipeline tracker
  4. Executive view
  5. Deal Navigator shared board → Command Center